Phase 1: Procurement Origination & Commercial Validation

PHASE 01
1
Day 1 – 2

Technical Enquiry & Parameter Definition

Submit your mill's fabric requirements, target GSM, gauge (14G–44G), cylinder diameter (30"–44"), feeder count, and production capacity goals.

2
Day 2 – 4

Manufacturer Matching & Factory Quotation

Our engineering sourcing team evaluates verified overseas manufacturers in China and Taiwan to match your configuration and secure direct factory CFR pricing.

3
Commercial Phase

Proforma Invoice & L/C Opening

Tasneem issues a formal Proforma Invoice (PI) under CFR Chattogram terms. You open a commercial Letter of Credit (L/C) through your commercial bank in Bangladesh.

Phase 2: Pre-Shipment Inspection, Freight & Installation

PHASE 02
4
Pre-Loading Phase

Pre-Shipment Quality Inspection

Independent inspection teams verify machine components, motor running, cam track finish, cylinder micro-tolerance, and export crating at the overseas factory.

5
Transit Phase (14–21 Days)

CFR Ocean Freight to Chattogram Port

The machine is sealed in moisture-protected vacuum crates and transported via container vessel to Chattogram Port with complete original shipping documents.

6
On-Site Setup

Factory Installation & Commissioning

Upon delivery to your mill, our local technical team completes precision leveling, creel setup, oil mist tuning, trial knit verification, and operator training.

2026 TASNEEM KNITTING INDUSTRY • BANGLADESH
REQUEST TECHNICAL CFR QUOTATION
Our Institutional Commitments

Risk-Free Procurement Standards.

100% Pre-Shipment Inspection

Third-party accredited engineers (SGS, Intertek, or BV) inspect every machine component, cam tolerance, and test-run before container packing.

01 / 04VERIFIED

Direct CFR Chattogram Pricing

Zero local intermediary margins. We procure directly from primary machinery manufacturers in Taiwan and mainland China under bank-to-bank L/C.

02 / 04VERIFIED

Factory-Floor Installation & Commissioning

Our local Narayanganj engineering team handles precision leveling, creel & oil mist setup, trial knit fabric testing, and operator training.

03 / 04VERIFIED

Genuine Spares & Lifetime Support

Immediate local availability of critical needles, sinkers, cam sections, and electronic inverters from our Narayanganj BSCIC hub.

04 / 04VERIFIED
CFR
START WITH STEP 01

Ready to Configure Your Next Machine?

Submit your fabric specifications, cylinder diameter, and target gauge to receive an official CFR Chattogram proforma breakdown and delivery schedule.